Fast drilling technology for horizontal wells in oil shale segment of Huang 36 Well Area.

查看详情 浏览次数:1
单位1中国石油川庆钻探长庆钻井总公司第四工程项目部,陕西定边 718600, 2中国石油长庆油田公司长南项目组,陕西定边 718600, 3中国石油川庆钻探长庆钻井总公司定向井公司,陕西西安 710018, 4中国石油华北油田分公司第四采油厂,河北廊坊 065000
来源Oil Drilling & Production Technology / Shiyou Zuancai Gongyi
出版年2015
期号No.4
摘要
In regard of the problems of easy collapse of oil shale, difficulty in sliding of PDC drill, and low rate of penetration in deflecting segment, due to long length and steep well deflection of Chang 7 oil shale segment, low load bearing capacity of Chang 4+5 stratum, and failure of drilling fluid density to meet the required density for balancing collapse pressure of oil shale during drilling for horizontal wells of Chang 8 target stratum of Huang 36 Well Area, density is raised by lowering displacement from pure plugging and leakage prevention, and collapse pressure of oil shale segment is improved by lowering alternating stress of oil shale and controlling well deflection of oil shale segment. In addition, the method of deflecting by roller bit is adopted to lower collapse probability and effectively improve rate of penetration. The method effectively solves the problem of narrow-density windows, facilitates guaranteeing drilling safety, improves construction efficiency and lowers drilling cost.

@ 2023 版权所有 中国地质图书馆 (中国地质调查局地学文献中心)

京ICP备 05064591号 京公网安备11010802017129号

建议浏览器: 火狐、谷歌、微软 Edge、不支持 IE