Determining the best depth of subway tunnel excavation considering ground type, support system characteristics, and tunneling cost: case study of Tabriz subway, Line 2

查看详情 浏览次数:1
中文题名综合地面类型、支撑系统特征和隧道掘进成本确定地铁隧道的最佳深度:以大不里士地铁2号线为例
作者Akbarzadeh Arpachaei
作者单位Sahand University of Technology,Iran
刊名Bull Eng Geol Environ
2023
82
423
摘要
The cost of subway construction is especially dependent on stations’ construction cost. In order to minimize these costs, an optimum depth for subway tunnels should be adopted. This study intends to investigate the best depth of tunnel construction for Tabriz subway, Line 2. The study is carried out in two categories of technical and financial studies. In technical studies, surface settlement is the ruling criteria, which its allowed limit is 25 mm. Results showed that depths less than 1.5 times the tunnel diameter bear settlement above the limit; therefore, tunneling in such depths is not recommended. Financial studies consist of a cost analysis of tunneling and subway station construction. To do so, the depth of station construction and their distance from each other have been analyzed. Results indicated that the construction costs are highly dependent on the stations’ depth and their distances. To put it more clearly, the least subway costs are achieved when the overburden is at minimum and station distance is at maximum. To be more specific, along the 17 km of the route, when the station depth is greater than twice the tunnel diameter, and their distance is 750 m, the unit cost of construction reaches 29 M$, while it is at its minimum (7 M$) when the stations’ depth is less than tunnel diameter, and their distances are 3000 m. Eventually, the optimum depth for Line 2 of the Tabriz subway is 1.5 to 2 times the tunnel diameter, while obviously, more distanced stations cost less.

@ 2023 版权所有 中国地质图书馆 (中国地质调查局地学文献中心)

京ICP备 05064591号 京公网安备11010802017129号

建议浏览器: 火狐、谷歌、微软 Edge、不支持 IE